Quality Clauses

Note: Review each commodity you are supplying based on the list included, then adhere to the requirements based on each applicable Q code.

Normal Purchases, Government, and CommercialQ Attachments
Aluminum housings, heat sinks, partsQ5, G6, G8, Q7 (review 1st Article Inspection criteria in Form F-099), Q18, Q19, Q20, Q21, Q22, Q23, Q24
Aluminum, Steel, BrassQ5, G6, Q6 These codes are for raw mtls. Supplied directly for internal machine shop. Q18, Q19, Q20, Q21, Q22, Q23, Q24
AnodizingQ5, G6, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Bare Printed Circuit BoardsQ5, G6, G8, Q7, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
CalibrationQ16, Q18, Q19, Q20, Q21, Q22, Q23, Q24
CapacitorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Chem. FilmQ5, G6, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
ConnectorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Epoxy, Silicon Rubber, Adhesive, Conformal CoatingQ5, G6, Q18, Q17, Q4, Q19, Q20, Q21, Q22, Q23, Q24
FastenersQ5, G6, G8, C1, Q18, Q19, Q20, Q21, Q22, Q23, Q24
FiltersQ5, G6, G8, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Flex Printed Circuit BoardsQ5, G6, G8, Q18, Q19, Q20, Q21, Q22, Q23, Q24
I.C.sQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
InductorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Loaded Boards – Outside ContractingQ5, (W1 or W2), G6, G8, Q18, Q19, Q20, Q21, Q22, Q23, Q24
LoadsQ5, G6, G8, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Outside MachiningQ5, C1, G6 (add Q6 if machine shop provides material), Q17, G8, Q7 (review 1st Article Inspection criteria in Form F-099), Q18, Q19, Q20, Q21, Q22, Q23, Q24
Packaging MaterialsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Packaging, Mil-spec.Q5, Q15, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Plating, Gold, Etc.Q5, G6, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
RegulatorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
ResistorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Source Control Document PurchasesC2, Q5, G6, Q18, Q17, W2, Q19, Q20, Q21, Q22, Q23, Q24
ScrewsQ5, G6, C1, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Sheet Metal PartsQ5, C1, G6, G8, C1, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Shelf life MaterialsQ5, Q4, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Silk ScreeningQ5, G6, Q17, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Subcontract assembly and mfgC1, C2, W1/W2, Q3, Q5, G6, Q6, G8, G11, Q17, S1, Q18, Q19, Q20, Q21, Q22, Q23, Q24
SwitchesQ5, G6, G8, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Test Equipment, NewG4, G6, Q16, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Test Equipment, UsedG3, G6, Q16, Q18, Q19, Q20, Q21, Q22, Q23, Q24
TransistorsQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
WireQ5, G6, Q18, Q19, Q20, Q21, Q22, Q23, Q24
Form #F-143, Rev L
Q AttachmentRequirementDetails/requirement
C1Clean, oil freeAll screws, nuts, washers, standoffs, and other machine parts must be clean & free of oil residue
C2Configuration ControlIf the supplier makes any Class 1 (fit, form, or function) or Class 2 (other then clerical) changes they must notify the Aethercomm Quality Manager in writing before the change is implemented. All Class 1 changes require Aethercomm Quality Management approval. This includes any and all process changes required to build the component being purchased.
I 1InsuranceCarrier shipping insurance is required for shipment of expensive parts
G1Government Source InspectionGovernment source inspection required in-process or before final inspection before shipment
P1Mil-P-55110All PCB’s must be made out of polyemid, and processed per this military specification
R1ROHS solderSupplier must clearly identify ROHS from non-ROHS product
W1WorkmanshipSupplier must meet IPC-610, Class 3 workmanship (specified in PO)
W2WorkmanshipSupplier must meet IPC-610, Class 2 workmanship (specified in PO)
Q2Customer Source InspectionAethercomm source inspection required in-process or at final inspection before shipment
Q3Aethercomm Source InspectionThis must take place before shipment of product to Aethercomm
G3Equipment CalibrationEquipment must be calibrated in accordance with Mil-Std-45662A or ANSI/NCSL Z 540-1 before shipped to Aethercomm
G4Certification of CalibrationThis is only used for new equipment. The manufacturer includes a certification with the shipment that states they certify the equipment meets all manufacturers specifications. This should be a no cost.
Q4Shelf Life LimitedProduct must be clearly identified with applicable manufacture & expiration dates. All material must have at least 75% of the storage life remaining upon receipt.
Q4.2Mil-I-45208AInspection & Test System must be in place
Q4.1Mil-Q-9858ASupplier must have a Quality Program Requirements system in place that insures contract requirements will be fulfilled
Q4.4ISO 9001Certification Current Certification by an accredited 3rd party required
Q4.5AS 9100Certification Current Certification by an accredited 3rd party required
Q5Standard Certification of Conformance (C of C)This statement must be included with shipment, signed and dated by a company representative. I certify this product meets all purchase order requirements, reference PN(s), quantities, lot #’s, and SN’s, if applicable .
G6RecordsRecords of manufacturing, testing, processing, inspection, packaging, and shipping, shall be retained for a minimum of 7 years. Records shall be made available for review on request.
Q6Raw Material-Physical and Chemical AnalysisInclude raw material certifications with shipment that includes a copy of the detailed report of the physical and chemical analysis
Subcontract Assembly and Mfg companies:
Fabricated parts (i.e. metal parts) shall be kept on file and available for review within 2 business days
Q6APackaging-Bag & Tag-Bulk, not sensitive to shipping or handling damageEntire lot must be bagged/boxed, and the bag/box must be identified. Parts must not be co-mingled with different part numbers or different lot numbers
Q6BPackaging-Bag & Tag-Individual, when sensitive to shipping or handling damageEntire lot must be bagged/boxed, and the bag/box must be identified. Parts must not be co-mingled with different part numbers or different lot numbers. Parts must be individually wrapped/segregated to prevent contact with each other.
D7Non-conformanceA system shall be in effect for the control of material nonconforming to drawings, specifications or other purchase order requirements
Q7First Article requiredThe supplier shall submit a First Article Inspection Report (FAIR) that records all inspection measurements and notes on SAE AS9102 form or in Seller’s format. The FAIR shall reference the Purchase Order number and must accompany the FAIR item. Item undergoing FAIR shall be identified as FAIR item prior to shipment. All items/assemblies shall have been manufactured using the same production processes and equipment which will be used in fulfilling the contract. The criteria to perform a FAIR is:
Initial fabrication of partsParts have not been fabricated in two yearsEngineering drawing has been revised since parts were last fabricated (only delta FAIR is required)The documentation shall include:
Drawing and Actual dimensions of the FAIR used to verify the part is compliant to the drawing (unless specifically stated on the PO)Mill report/certifications for raw material, as requiredSpecial Process certifications from sub tier suppliersHeat Treat certifications, as required
S1Subcontract Assembly & Mfg companies – First ArticleSubcontract Assembly and Mfg:
Fabricated parts shall have the documentation used by the sub-tier supplier to verify conformance to the engineering documentation on file in the sub-tier supplier’s formatDocumentation will consist of the items noted in Flow down Q7 and be made available upon requestThe criteria to perform a FAIR is the same as Flow down Q7
G8Use-As-Is and RepairAre not allowed unless customer approval is obtained in advance by a signed waiver.
Q8Acceptance Test ReportInclude with each shipment a true copy, signed by a responsible representative of the supplier of the result of the lot or item acceptance tests required by the applicable specification. The report shall indicate the actual values obtained.
Q9Approved Process SourcesSupplier shall use only those approved process sources identified on the purchase order. A certification from the supplier shall be forwarded with each shipment.
Q15Special packagingA specification or instruction will be called out in the Purchase Order for special packaging of material when complete.
G11Foreign Object Damage (FOD)Supplier shall establish procedures to control and eliminate Foreign Object Damage, and contamination throughout their entire processes.
Q16Calibration MethodCalibration must meet a minimum of ANSI/NCSL Z 540-1 and AS9100.
This includes:
A certificate of calibration shall be delivered to Aethercomm showing the components outlined in ANSI/NCSL Z540.1 paragraph 13 – Certificates and Reports with traceability to reference standards.In the event of an Out-Of-Tolerance condition, the calibration supplier shall notify Aethercomm promptlyThe supplier shall maintain calibration records for a minimum of 10 yearsShould repairs be done on a piece of calibrated equipment, the specific repair shall be described by the supplierSee purchase order for any additional information
Q17Secondary ProcessesInclude the Aethercomm P.O. number on all documents relating to secondary processes (plating, machining, etc.).
Subcontract Assembly and Mfg companies – certifications for secondary processes shall be maintained on file and available upon request.
Q18Counterfeit Parts MitigationThe supplier, and its’ sub-tier suppliers, shall ensure that only new materials are used in products required to be delivered to Aethercomm. Electronic components shall be procured from the OEM/OCMs or their Franchised (licensed) Distributors. No electronic components shall be purchased through or from Non-Franchised Distributors or Brokers without express written approval from Aethercomm Purchasing and QA Directors. The Supplier shall include and flow down this requirement to all subtiers for electronic parts or assemblies.
Q19Competence, Training and AwarenessThe supplier shall ensure personnel processing orders or performing work affecting conformity to product or service are trained and aware of the relevance and importance of their activities in relation to meeting the requirements of Aethercomm purchase orders and associated documentation.
Q20Product Safety & Ethical BehaviorThe supplier shall ensure personnel processing orders or performing work affecting conformity to product or service are aware of their contribution to product safety and the importance of ethical behavior.
Q21Right of AccessRight of access shall be given to Aethercomm, our customer and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records.
Q22Customer Requirements Flow DownCustomer requirements will be flowed down (as required) to External Providers, typically within Notes added to the Purchase Order.
Q23Interactions with AethercommAll Supplier Interactions with Aethercomm should be initially coordinated through Purchasing.
Q24Provide Test SpecimensWhen noted on the Purchase Order, Supplier shall provide test specimens for design approval, inspection/verification, investigation, or auditing.
Form #F-099, Rev P

GQR-1

AETHERCOMM GENERAL QUALITY REQUIREMENTS

A. PROHIBITED PRACTICES

Unauthorized Repairs/Rework
No repair or rework shall be allowed outside of the specific specification limits, (i.e., welding, reheattreat, insert removal, re-installation, etc.) unless prior approval is obtained by the Seller from the Buyer All deviations shall be submitted for approval by the Buyer. Submission of deviation in no way affects any contractual requirements until an approved disposition is issued by the Buyer. The approved deviation shall be included with the part/documentation package when delivered to Buyer.

Use As Is

Shall not be allowed unless approved by a signed waiver.

Change in Approved Drawings, Processes, Materials or Procedures
Seller shall not change any drawing, process, material, or procedure without prior written Buyer approval, if such drawing, process, material, or procedures were originally approved by Buyer. Approval requests shall be submitted to the Buyer. This requirement is not relevant for Commercial and/or Military Part Numbers.

Seller shall not change any process, material, or procedure from that used to qualify items or which was used by Seller to become a qualified source without written approval by Buyer.

Re-submittal of Rejected Items Items rejected by Buyer, and subsequently resubmitted to Buyer, shall be clearly identified on Seller’s shipping document as resubmitted items. New lot control identification numbers are to be provided, if required by the Buyer.

Unauthorized Submittal of Production
When the Purchase Order requires Buyer acceptance of a “first article,” Seller shall not submit items from a production run for Buyer inspection prior to Buyer’s acceptance of such “first article.”

Part Substitution
Part substitution shall not be allowed; the exact part number as identified on the Purchase Order, or the exact part number identified in the purchase item drawing shall be provided. For Distributors only, if the ordered part is not available, and the Distributor has a replacement part, the Distributor shall submit a Request for technical evaluation and approval prior to delivery of the replacement part.

Notification of Facility Change
For OEM/OCM:
Seller shall not use or relocate any production, manufacturing, and/or processing facilities during performance of the work specified on the Purchase Order from those production, manufacturing, or process facilities previously qualified by Buyer without promptly notifying Buyer and affording Buyer an opportunity to examine such facilities for compliance with Quality requirements. Seller shall notify Buyer of changes.

For Distributors:
Seller shall not use or relocate any distribution or value-add facilities during performance of the work specified on the Purchase Order from Seller facilities previously qualified by Buyer without promptly notifying Buyer and affording Buyer an opportunity to examine such facilities for compliance with Quality requirements. When notified by the changes, the Seller shall notify the Buyer. Value added services provided by the Seller are subject to the notification. Seller shall notify Buyer of changes by submitting a Request.

B.SELLER RESPONSIBILITY FOR CONFORMANCE

The Seller named on the purchase order retains full responsibility for ensuring products, suppliers, or services furnished here under; comply with all applicable specification and standard requirements for design, construction, and workmanship. All Industry Standards/Specifications and flow downs shall be to the latest revision unless otherwise stated on the Buyer Purchase Order.

Acceptance of the Purchase Order and receipt of product at Buyers location certifies that items processed on this order meet all the requirements imposed.

This includes any/all suppliers or services purchased from a secondary (sub-tier) supplier that are incorporated into or are used to produce, inspect, or test products or services under this Purchase Order.

The Seller shall:Provide (flow-down) of applicable specification and standards requirements to sub-tier suppliers.Ensure, by performing physical and/or functional inspections that sub-tier suppliers have complied with the requirements of this Purchase Order.Upon request, Seller shall provide objective evidence to Buyer Quality personnel of compliance to this provision.Neither surveillance, inspection, and/or tests made by Buyer, or their representatives, or representatives of the Buyer’s Customer at either Seller’s or Buyer’s facility, nor Seller’s compliance with all applicable Quality requirements, shall relieve Seller of the responsibility to furnish items which conform to the requirements of the Purchase Order.

Seller shall control sub-tier procurements to the extent required to assure quality requirements specified in Buyer Purchase Orders are satisfied.

C. BUYER SURVEYS, SURVEILLANCE, AUDITS, AND INSPECTION

Buyer, Buyer’s Customer, and Authorities have the right to conduct surveys, audits, and surveillance of Seller’s facilities, or those of Seller’s subcontractors, or suppliers with prior coordination with Seller to determine the capability to comply and to verify continuing compliance with the requirements of the Purchase Order.

Buyer, Buyer’s Customer, and Authorities have the right to perform inspection at Seller’s facilities, or those of Seller’s subcontractors, or suppliers with prior coordination with Seller during the period of manufacture and inspection prior to shipment.

Final inspection is the Seller’s responsibility to complete prior to shipment for validation of contractual requirements. Final acceptance Inspection shall be completed at the Buyers facility, unless otherwise specified on the Purchase Order.

D. CORRECTIVE ACTION REQUESTS

When a quality problem exists with Seller’s items, Buyer may forward a Corrective Action Request to Seller. Corrective Action Requests require timely responses and includes:The short-term containment of suspect parts (if applicable);Analysis of the cause of the problem;Statement of the action taken to prevent recurrence;The effectivity of the action.When corrective action is required for Government Source Inspected items, Seller shall coordinate such action with the Government Quality Assurance Representative assigned to Seller’s facility.

E. MEASURING AND TEST EQUIPMENT

Seller shall be responsible for validating the accuracy and stability of tools, gages, and test equipment used to demonstrate that items conform to the Purchase Order. Traceability of calibration equipment and gages shall be to the National Institute of Standards and Technology (NIST) which is in conformance with ANSI/NCSL-Z-540-1 or ISO 10012:2003 unless stated otherwise in the Purchase Order.

Documented schedules shall be maintained to provide for periodic calibration to adequate standards. Objective evidence of calibrations shall be recorded and made available for Buyer review.

If the SOW, specification, or other contractual flow down documents/requirements specify a higher or alternate calibration requirement, it takes precedence over the specification above.

If seller is performing a process or a test where the use of calibrated equipment is not utilized, this clause does not apply.

F. NONCONFORMING MATERIAL

Decisions to accept nonconformances (variances from Buyer drawings and specifications) detected at Seller’s facilities must be made by Buyer, unless otherwise specified by the Purchase Order. Shipment of nonconforming items must be accompanied by a Buyer-Approved Supplier Discrepancy Report. The Supplier Discrepancy Report must be dispositioned by the Quality Engineer prior to shipment.

Seller shall provide for control, segregation, and identification of non-conforming material detected at Seller’s facilities.

Seller does not have MRB authority without express written authorization of the Buyer. Seller must request MRB authority by submitting MRB board members’ resumes and positions currently held.

G. INSPECTION RECORDS

Seller shall maintain records of all inspections and tests performed on items delivered to Buyer. These records shall identify nonconformances and shall be made available for Buyer, Buyer’s customer and regulatory review. Period of retention is 3 years from close of order, unless otherwise specified on the Purchase Order.

H. PACKAGING

Boxes or containers, as applicable, should be selected to the extent necessary to provide protection from physical and environmental damage during shipping and handling. Cushioning materials shall be applied, as required, to protect and to restrict movement of the item(s). Electrical components shall be kept from direct contact with cardboard and other paper products. Electrostatic Discharge sensitive component shall be package per the requirement of Seller’s electrostatic discharge control program detailed in section N. Perishable items or those with limited shelf life must be handled/preserved in accordance with recommendations of the manufacturer.

Ceramic (Substrate) Printed Circuit Boards shall be packaged to prevent surface damage-cracks and scratches to occur such as individual wrapping or individual container.

Silver plated parts shall be wrapped in appropriate treated kraft paper / silver paper such as ULINE Silver Saver.

Hardware or metal housing that has flexible parts shall be packaged with stiff backing to prevent damage from shipping and unpacking.

I. COUNTERFEIT PARTS PREVENTION

At a minimum, Seller shall have a counterfeit parts prevention plan that incorporates the following:Assesses potential sources of supply to determine risk of receiving counterfeit parts.Maintains a register of approved suppliers, including the scope of the approval, to minimize the risk of counterfeit parts supply.A documented process to specify contract/purchase order quality requirements to minimize the risk of being provided counterfeit parts.A documented process to assure detection of counterfeit parts prior to formal product acceptance. The rigor of the verification process shall be commensurate with product risk.A documented process to assure that all occurrences of counterfeit parts are reported, as appropriate, to internal organizations, customers, government reporting organizations (e.g., GIDEP), industry supported reporting programs (e.g., ERAI), and criminal investigative authorities.The Seller, and its’ sub-tier suppliers, shall ensure that only new items (EEE parts, components, equipment, hardware, or materials) are used in products required to be delivered to the Buyer. To further prevent the inadvertent use of counterfeit parts, the Seller may only purchase components and parts procured directly from the Original Component Manufacturer (OCMs), the Original Equipment Manufacturers (OEMs), or through the OCM/OEM’s authorized distribution chain.

The Seller, and its sub-tier suppliers, shall not provide refurbished or used items (EEE parts, components, equipment, hardware, or materials) unless first approved in writing by the Buyer. The Seller, and its sub-tier suppliers, shall not provide items through a non-franchised distributor unless first approved in writing by the Aethercomm Buyer through the request and approval of a Deviation.

No alterations of requirements are permitted until the Deviation is issued by the Buyer or Seller and approved by the Buyer. The Seller must present complete and compelling support for its request and include in its request all actions to ensure the parts thus procured are legitimate, authentic, non- counterfeit parts. All C of C documentation shall be on file at Seller’s facility and available to Buyer upon request.

The Seller shall segregate and provide full, inclusive of all supply chain intermediaries from the part manufacturer to the direct source of the product, traceability identifiers (i.e., name and location of all supply chain intermediaries, date code/lot code, and serial number) for all items delivered to Buyer which contain an item procured from sources other than OEMs or OCMs or their Authorized Distributors.

MIL Spec parts MIL-PRF-38535, MIL-PRF-19500, and those MIL Spec parts covered under MILSTD 790 shall include C of C documentation via instructions as specified by Buyer.

Seller shall provide timely (within 14 days) notification to Buyer with the pertinent facts if Seller becomes aware of, or that it has delivered fraudulent, suspect counterfeit, or counterfeit work.

Suspect counterfeit or counterfeit parts will not be returned to Seller nor reimbursed. Seller shall at its expense promptly replace any suspect counterfeit or counterfeit parts with new parts conforming to the requirements of the Purchase Order. Buyer will provide documentation to the Seller with results of investigation indicating suspect counterfeit parts and coordinate any Seller review of suspect counterfeit parts at the Buyer’s facility.

Seller and all sub-tier suppliers of Seller shall not use any suppliers who have been suspended or indicted for counterfeit part reasons.

Federal Penalties Associated with Fraud—This purchase order and activities herein are within the jurisdiction of the United States Government. Any knowing and willful act to falsify, conceal or alter a material fact, or any false, fraudulent or fictitious statement or representation in connection with the performance of work under this purchase order may be punishable in accordance with applicable Federal statutes. This clause applies in addition to any quality provision, specification, statement of work or other provision included in this Purchase Order addressing the authenticity of work. To the extent that such provisions conflict with this clause, this clause prevails.

Seller shall include flowdown of equivalent provisions in all lower tier procurements for items that will be included in or furnished as items to the Buyer.

K. TEST SAMPLES/REJECT/REWORK PART PACKAGING AND IDENTIFICATION

All test samples and/or reject parts to be shipped to Buyer shall be packaged in appropriate packaging medium to protect parts from damage. These items shall be packaged separately from compliant product and shall be identified/labeled with part number, date/lot code, and identified as test samples/rejected and/or reworked parts (if applicable).

L. CONFIGURATION MANAGEMENT REQUIREMENTS

The Seller is required to establish engineering and manufacturing controls to ensure that the configuration of the end item(s) comply with the specification requirements. The configuration end items (hardware, software) delivered under this contract shall conform to those configuration management and engineering documentation requirements implicit in the specification. The Seller shall impose the same configuration requirements on their vendors and suppliers in concert with the above requirements. The following configuration management functions are basic to good practices:Product IdentificationConfiguration change controlMaterial traceability

M. ELECTROSTATIC DISCHARGE PROTECTION

For the contractual requirements of parts that are ESD sensitive, the Seller shall have an Electrostatic Sensitive Discharge (ESD) control program subject to review and approval by Buyer in compliance to the requirements of the applicable standard specified by the Purchase Order. As a minimum, MIL-STD-1686, ANSI/EIA-625, ANSI/ESD S20.20, or JESD 625 shall be complied with.

Packaging techniques using MIL-B-81705 Type I, or Type II barrier material or equivalent shall be used in device shipment. A label identifying that the parts are static sensitive shall be attached to the package.

N. SHELF LIFE

Each shipment of material with a finite shelf life shall be accompanied by documentation to determine expiration date based on the OEM method for determining useful life (date of manufacture, date of shipment or expiration date as applicable). Product that has a shelf life requirement shall be marked with this information, and shall have 75 percent remaining total available shelf life from the initial date of certification when received by the Buyer. The latest SDS/MSDS for all chemical shall be supplier to Buyer upon request.

O. SOLDERABILITY / MOISTURE SENSITIVE PARTS

Product that have leads, terminations, wiring, etc. intended to be soldered by the Buyer shall meet the requirements imposed by the procurement document (military specification, industry standard practices for hand and machine soldering.

Plastic Encapsulated Microcircuits (PEMs) that exhibit moisture sensitivity in relation to the surface mount reflow soldering processes shall meet the PEM packaging requirements specified below.

PEM Packaging Requirements (Moisture Sensitive Parts)

Seller shall “dry” pack all moisture sensitive devices in a Moisture Barrier Bag (MBB) with desiccant and humidity indicator card (HIC) I.A.W. J-STD-033 or equivalent.

Seller shall label all moisture sensitive devices with level, seal date, shelf life and baking instructions I.A.W. J-STD-033 or equivalent. Received items shall have a minimum of nine months of shelf life remaining upon receipt.

P. COMPETENCE, TRAINING AND AWARENESS

The supplier shall ensure personnel processing orders or performing work affecting conformity to product or service are trained and aware of the relevance and importance of their activities in relation to meeting the requirements of Aethercomm purchase orders and associated documentation.

Q. PRODUCT SAFETY & ETHICAL BEHAVIOR

The supplier shall ensure personnel processing orders or performing work affecting conformity to product or service are aware of their contribution to product safety and the importance of ethical behavior.

R. INTERACTIONS WITH AETHERCOMM

All Supplier Interactions with Aethercomm should be initially coordinated through Purchasing.

S. PARTS REQUIREMENTS

For the below listed material types, the noted requirements and information is required to accompany the received material:

Date Code or Lot Code shall be stated on the CofC and shall match the part label.

Electronic Components – Lot Code or Date Code and C of C (Certification of Conformance)
Serial Number (if applicable)

Wires – Lot Code or Date Code and C of C

Hardware – Lot Code or Date Code and C of C.
Special Process C of C if Loctite has been used on Hardware.

Epoxies – Lot Code or Date Code, C of C, Date of Manufacture and Expiration Date

Custom Parts*:

Metal – Lot Code or Date Code and C of C for Raw Material
Printed Circuit Boards – Lot Code or Date Code, serialization and C of C
Following shall be delivered from each lot manufactured.

Reports: Copies of your internal data-report for;
Lab Cross Section report
Electrical TestCofC
Impedance Test Report (when applicable)

Coupons: Set of A & B coupons.
Solder Sample
Cross Section Solder Floated Mount:

Ceramic (Substrates) Printed Circuit Board – Lot Code or Date Code, serialization and C of C
Reports: Copies of your internal Lab Cross Section or XRF results, Electrical Test or statement
no Opens/Shorts
A solder sample shall be delivered from each lot manufactured

Cables – Lot Code or Date Code and C of C

SCD (Source Control Drawing) – Lot Code or Date Code and C of C

Subcontract assembly manufacturing – Lot Code or Date Code and C of C for Raw Material.
Raw Material – Purchased items that are used to build the final unit.

*Notes: Notes: Include C of C for Special Process if applicable. Supplier to retain C of C for raw material for 10 years and make available to Aethercomm if requested.

Contact Us

Contact Us form